Installation: most faults are not faults

Of the units sent back to us as dead, roughly nine in ten work when they arrive. They were fitted into a housing with no clearance, plugged into a port that browns out at 400 mA, or grounded through an anodised coating. This page is the checklist we run through on the phone — printed here so you can run it without calling.

Infrared frames

Eight steps, and the numbers that matter

Tools: PH1 screwdriver, 0.5 N·m torque driver if you have one, 70 % isopropyl, lint-free cloth, multimeter, cable ties.

01

Dry-fit before you drill anything

Set the frame on the housing with no screws and press each corner. It must not rock. A 0.3 mm rock at one corner becomes a 2 mm positional error at the opposite one, and calibration cannot remove it because the frame is physically twisted.

02

Clean the four faces the clamps touch

70 % isopropyl on a lint-free cloth. A single dust particle under a clamp lifts the frame by roughly 0.1 mm and shows up as a dead spot near that corner. Do not use window cleaner — the surfactant leaves a film that attracts dust.

03

Measure the lit area, not the diagonal on the box

A 55 inch display is 55 inch across the glass, but the lit area is smaller and the bezel is 8–20 mm. The frame is cut to clear the lit area. If you give us the diagonal instead, expect to shim.

04

Fix opposite corners first, then snug — never tight

M3 into aluminium: 0.5 N·m, and 0.6 N·m is already the point where the thread starts to pull. Two screws, opposite corners, then the other two, then a final pass at torque. A stripped insert in a 2.5 m extrusion is not repairable on site.

05

Check the glass sits inside the active area

Glass up to 5 mm is standard; 8 mm needs the wide-gap version. What matters more than thickness is the edge: if the edge of the cover glass crosses the beam path, you get a permanent dead line down that side.

06

Route the USB cable away from the backlight driver

The supplied cable is 1.8 m. USB 2.0 is reliable to about 3 m passive; beyond that use a powered hub or an active extension, and never a passive 5 m cable with a 40-point frame. Keep the run away from the inverter or LED driver — a 200 Hz report rate is easy to disturb.

07

Ground the frame to the chassis

Measured resistance under 4 Ω. Anodising is an insulator, so a screw through the coating is not a ground: use a toothed washer or scrape a 5 mm spot under the lug. An ungrounded frame in dry air ghosts, and the fault looks like a firmware bug.

08

Power on, then calibrate before you judge it

Plug in, let the OS enumerate the digitizer, then run calibration with the frame already fixed in its final position. Calibrating on the bench and then mounting the frame throws the mapping out by the thickness of your brackets.

Numbers to design around

Clearance table

DimensionWhat to leaveNote
Frame outer sizeSee the size page for your diagonal± 1.0 mm on the drawn dimension
Housing cut-outFrame outer + 4 mm on width and height3 mm extra at the cable exit
Frame depth9.5 mmAdd 2 mm if the USB plug is moulded, not overmoulded
Glass thickness≤ 5 mm standard8 mm with the wide-gap frame
Front clearance0 mm — frame sits proud of the glassBezel visible from the front, by design
ScrewM3 × 6, four corners, 0.5 N·mInserts in the extrusion, not in the housing
Capacitive panels

Six steps, and where the yield goes

A capacitive panel is a bonding job before it is an electronics job. Most of the failure modes are decided before the controller is ever powered.

01

Decide the bonding before you cut the housing

OCA sheet, liquid OCR, double-sided tape, or an air gap. OCA is the cleanest and costs the most. Tape is fine indoors and fails outdoors when the gap fogs. The stack-up decides your housing depth, so this is a drawing-stage decision, not an assembly-stage one.

02

Bond in a clean area, not on the line

One particle between sensor and glass is a bubble, and a bubble over 0.3 mm in the active area is a reject. Laminating in the same room as the frame saw is the single most common cause of a bad first batch.

03

Keep the FPC bend radius at three times its thickness

No creases, no folds at 90°, no tension on the connector. Tape the tail down within 10 mm of the connector so vibration cannot walk it out. A tail that fails in the field always fails at the crease.

04

Ground the sensor shield to the chassis

Same rule as infrared: under 4 Ω. A floating shield picks up switching noise from the power supply and shows up as a jittering cursor that only appears on some units.

05

Match the cover glass to the firmware

1.1 mm, 1.8 mm and 3 mm glass need different sensitivity settings. The panel is tuned for the stack you tell us about; if you change glass after approval, the tuning has to change with it.

06

Test twenty points and the four edges

Twenty simultaneous fingers, then a finger dragged along each edge 5 mm in from the border. Edge linearity is where a panel that passed a five-point centre test still fails in the field.

Before you power on

The five-minute check

  • Frame or panel sits flat, no rock at any corner, no gap you can see light through.
  • All screws at 0.5 N·m, none missing, none over-torqued.
  • Frame-to-chassis resistance under 4 Ω, measured, not assumed.
  • USB cable has strain relief and does not pull on the controller connector.
  • Nothing is touching the active area — no tape, no protective film left on, no glass edge in the beam path.
  • Host powered from its real supply, not a bench USB charger.

Then calibrate. Judging a frame before calibration is judging a scale before it is zeroed.

When it misbehaves

Symptom, cause, fix

Ten faults that cover most of what we see. If yours is not here, the five-item request on the support page gets you a diagnosis in one reply.

SymptomLikely causeWhat to do
Cursor sits a few millimetres off, worse toward one cornerFrame mounted after calibration, or a twisted frameRe-run calibration with the frame fixed; check for rock at the corners
Ghost touches in dry weatherFrame not grounded, or ground through anodisingToothed washer to bare metal, measure under 4 Ω
Works, then drops out when the display wakesUSB port browning out — the frame peaks around 320 mA at 40-pointPowered hub, or a port that holds 500 mA; check with a USB power meter
Dead vertical stripeOne LED tube failed, or a glass edge crossing the beamSwap the tube; move the glass inside the active area
Touches register only near the centreDirty filter strip, or calibration done with an object on the glassClean the strip with isopropyl, remove everything from the surface, recalibrate
Two-finger gestures report as one fingerController flashed in single-touch modeSend us the label photo — we ship a reflash tool or swap the controller
OS shows “HID-compliant mouse”Wrong HID descriptorSame fix: reflash to the touch descriptor
Capacitive panel jitters only on some unitsSensor shield not grounded, or noise from the SMPSBond the shield to chassis, route the tail away from the supply
Capacitive dead band along one edgeAir gap too large, or printed border overlapping the sensorReduce the gap; check the border width against the drawing
No touch on Linux, fine on Windowshid_multitouch not loadedmodprobe hid_multitouch, then check dmesg
Remote commissioning

We can watch the first one go in

For any frame above 86 inch, any curved or LED-wall build, and any first capacitive bonding run, we join by video call. You prop a phone against the housing; our engineer watches clearances, screw order and cable routing while you work, and stops you before the mistake rather than after it. No charge, and it usually saves the cost of the call in the first ten minutes.

To book one: send the size, the date and a photo of the housing opening. We will confirm a slot in your timezone and send a short pre-install sheet for your size, including the frame drawing and the torque values.

Book a remote commissioning slot →

FAQ

Installation questions

How long does a first installation take?
An infrared frame on an existing display is about fifteen minutes with a screwdriver once the clearance is right: four brackets, one USB cable, one calibration run. A capacitive panel bonded into a new housing is half a day plus curing, and it needs an ESD bench rather than a desk.
Can I install the frame without removing the display from the wall?
Usually yes, if there is 30 mm of clearance at the bottom for the controller and the USB plug. The frame goes on from the front over the existing bezel. If the display is recessed into a wall with no side access, take it down — the risk of a dropped 86 inch frame is not worth the saved hour.
What USB cable length is safe?
Up to 3 m passive with the supplied 1.8 m cable extended by a good-quality cable. Beyond 3 m use a powered hub or an active extension. A passive 5 m cable will enumerate and then drop points under load, which is the worst kind of fault because it looks intermittent.
Do I need an earth connection for an indoor kiosk?
Yes. It is not about safety earthing, it is about the touch sensor: the frame and the chassis need to sit at the same potential or dry air will produce ghost touches. Under 4 Ω, measured between frame and chassis, not assumed from the paint.
Can you join the installation remotely?
That is the default for first installations above 86 inch, and for any capacitive bonding run. A video call with the phone propped against the housing, our engineer watching the corners go in, usually catches the clearance problem before the first screw.
The panel is bonded and there is a bubble. Can it be saved?
Below 0.3 mm and outside the active area, usually yes — it is cosmetic. Inside the active area or above 0.3 mm, the panel has to be delaminated and re-bonded, which on OCA means a new OCA sheet. Send a photo with a ruler in frame and we will tell you which of the two it is.

Send a photo of the housing.

One photo of the opening and the display's lit area is enough for us to confirm clearance, frame size and the cable route before you cut anything.

◉WeChat wm-lcd · scan or search the ID
◷Mon–Sat 09:00–18:00 GMT+8 · English & Chinese
Thanks — your request is with our engineering desk.
You will get a reply within 12 working hours, usually much sooner. If it is urgent, message WhatsApp +86 153 2343 9001 and quote your company name.

Or email us directly at info@wcimci.com. Drawings in DWG, STEP, PDF or DXF are all fine.

WhatsApp us